(no subject)
Jun. 22nd, 2006 09:27 amSo, there were two kinds of people in the New Haven parking structure this morning:
I managed to work 4.5 hours extra last night, so I only need to pick up another 27.5 hours in seven business days to secure my bonus. However, two of those days are Thursdays (fighter practice), so really that works out to 5.5 extra hours per day. I'll be lucky if I can tack on 5.5 more hours before the end of this week. Sonofabitch. That leaves 22 hours for next week.
I plugged in the new freezer this morning, so it should be down to freezing by about noon. It's using an extension cord right now, but hopefully I will get a chance to run the new circuit for it sometime soon. Ideally, I would like to do it this weekend, but I'm not sure it's going to happen. I have all the bits, but it takes a while to tack all that wire to the joists. I also have to demystify some of the existing junk at the same time, and that's always fun and time-consuming.
- Me
- Assholes
I've basically had a headache since Tuesday. Sometimes it is worse, sometimes it is better. I think it's mostly tension and weather. Hopefully that thunderstorm will roll through here and it will cool off and the pressure will normalize for a little while. Ah well. It wouldn't hurt if things would start cooling off, either.
I managed to work 4.5 hours extra last night, so I only need to pick up another 27.5 hours in seven business days to secure my bonus. However, two of those days are Thursdays (fighter practice), so really that works out to 5.5 extra hours per day. I'll be lucky if I can tack on 5.5 more hours before the end of this week. Sonofabitch. That leaves 22 hours for next week.
I should probably just let it go, but it's hard because it is right at that edge of possibility. It's not a reasonable goal, but it is an acheivable one. I wonder if it is worth it, though.
I plugged in the new freezer this morning, so it should be down to freezing by about noon. It's using an extension cord right now, but hopefully I will get a chance to run the new circuit for it sometime soon. Ideally, I would like to do it this weekend, but I'm not sure it's going to happen. I have all the bits, but it takes a while to tack all that wire to the joists. I also have to demystify some of the existing junk at the same time, and that's always fun and time-consuming.
There's a lot of other stuff I meant to include, but I forgot what it all was.
Maybe I'll get some work done.