tub, nearly done
Sep. 6th, 2007 02:14 pmSo, the tub-related plumbing is now done. I'm going to celebrate with a shower, and getting caught up on reading for school. I'm leak-testing the tub drain (I filled it with water and left it), but really I just need a break before I tack it to the studs and start installing the wall panels.
Since I have class tonight (and I missed last night), and there is fighter practice, I'm guess the finishing steps will be for tomorrow. Therefore, the todo list:
The jury is still out on the floor, but it's looking okay so far. I retract my previous statements about drain piping. Yuck.
Since I have class tonight (and I missed last night), and there is fighter practice, I'm guess the finishing steps will be for tomorrow. Therefore, the todo list:
- Tack in tub, glue base to furring strip.
- Pre-wire electrical behind kitchen wall for future disposal installation.
- Cut holes in wall panels for plumbing fixtures.
- Install wall panels.
- Install wiring for porch and outside fixtures.
- Install wiring for new wall sconces.
- Buy, measure, cut, and install sheetrock.
- Buy and install new toilet.
- Reinstall trim.
- Paint.
The jury is still out on the floor, but it's looking okay so far. I retract my previous statements about drain piping. Yuck.
no subject
Date: 2007-09-07 01:51 am (UTC)no subject
Date: 2007-09-07 12:35 pm (UTC)It's pulling off that first sheet of drywall/tile or whatever that takes it out of you. Once you do that, you're pretty much stuck.