[personal profile] sorrowmonkey
I was able to cut and install the counter top, mount it, and complete the dishwasher installation today. More work that it sounds like, since I had to undo all of the plumbing to mount the counter top, and then reinstall.

But we are currently washing dishes now. YAY!


On to the trim and remaining cabinets.

Date: 2009-08-20 12:10 am (UTC)
From: [identity profile] nrawling.livejournal.com
It is a bit like the project that never ends: I still have two cabinets to install over the sink, and floor and doorway trim to replace, but all of the parts that actually do stuff or are scary are done.

I can't believe how much we've spent on this project though. A fridge and a dishwasher equals BIG BUCKS. But, at this point, everything in the kitchen is new except for some cabinets, the sink, and the stove. Maybe next year we will get to those pieces.

Profile

sorrowmonkey

March 2017

S M T W T F S
   1234
567891011
12131415 161718
19202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 6th, 2026 07:43 am
Powered by Dreamwidth Studios